[EN]
[FR]
XXth century architectural heritage repository
  

Archaeological Museum (1960)

PDF version   Complete PDF version Many damages even to the bearing structure.
Conception  KARANTINOS Patros
Engineering  ANGELIDIS Socrates
Contracting authority  Ministry of Culture, Directorate for Museum projects, Department of Architectural Studies
Credit  UIA
 
 
Materials or Technics  reenforced concrete, bricks
State  Bad situation, overthrow of the original plans and decomposition of its function. The added wing (constructed in 1980) has altered its original character.